The situation

A boutique builder was planning a knockdown-rebuild on a suburban block with a large, protected eucalypt close to the proposed building line. Council had flagged the tree, and the project could not start without a compliant arboricultural impact report.

The outcome

The permit was approved without a redesign, and the tree remains on site today. Construction proceeded with the agreed protection measures in place.

“The permit was approved on the first submission.”

What we did

  • Mapped the Tree Protection Zone (TPZ) and Structural Root Zone (SRZ) from on-site measurements
  • Showed how the design could adjust within the retained footprint without encroaching on the root zone
  • Recommended fencing, mulching and supervision controls for the construction period
  • Prepared the report in the council’s required format for the planning submission