Case Study
Root excavation oversight and barrier checks across a multi-stage build.
A multi-stage residential build ran within metres of several protected trees. The council permit required an arborist on site for any excavation inside the tree protection zones, plus regular barrier inspections.
The build completed without a stop-work notice, a council fine, or damage to the retained trees.
“The whole program finished with zero stop-work events.”
Tell us about the tree, the build, or the decision in front of you.
Illustrative case study altered for client privacy.